Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
线上博彩平台
线上博彩平台
重庆农家乐网
sitbo-feedback@ngleyuan.com
青岛泉佳美硅藻泥
Betting-recommendation-contact@fabri-metal.com
火博体育
火博体育
Sports-betting-platform-support@cuannalong.com
欧博
Asian-sports-betting-platform-support@wickssilverlabs.com
二手机床网
新浪二手房北京租房网
广场舞蹈网
重庆第二师范学院
呈创科技
美女图片吧
河北师范大学招生就业处
幸运之门彩票网双色球